Project Overview
Background
In 2021, Breedon Priory Holdings and YMD Boon Architects developed a plan for a new two-storey health spa, which would be built alongside an existing gymnasium. Located in Wilson, which is just south of Melbourne in Derbyshire, the new spa would feature changing rooms and showers, treatment rooms, steam rooms and saunas, indoor and outdoor pools, and additional areas for relaxation. There would also be a retail area, kitchen and restaurant.
The design placed a strong emphasis on sustainability. This included the use of renewable energy systems such as solar PV and air source heat pumps, as well as using water from an on-site borehole, and equipping the building with high levels of insulation.
Some parts of the structure would feature traditional-style cavity walls of brick and stone; others would comprise sheathing board over the building’s lightweight steel frame. For these areas – covering approximately 400 m2 – an external wall insulation system would be installed.
Brief
The external wall insulation system would include a protective, decorative render finish, to be supplied in bright white. This would contrast with other materials including natural stone cladding on the columns, and vertical strips of timber cladding on feature walls. These natural materials would complement the slate tile roofs.
Design and Specification:
Permarock’s technical staff worked with the project design team to agree a specification for the EWI system, which comprised:
- Permarock Mineral Fibre External Wall Insulation: Dual density insulation boards, mostly of 80 mm thickness;
- Permarock SiliconeUltra K Finish (textured render).
Other products used in the system included, amongst others, Permarock Bedding Mortar, Permarock Reinforcing Mesh, and stainless-steel fixings.
The Permarock Mineral Fibre Insulation was supplied in boards measuring 1200 mm x 600 mm. Generally, they were installed to a thickness of 80 mm but other thicknesses were used as necessary to complete the detailed design. The insulation boards were attached using Permarock Lamella Adhesive and mechanical fixings.
Permarock SiliconeUltra K Finish is a textured render that delivers reliable weather protection. It is flexible and vapour-permeable, and it helps to maintain airtight facades, which enhance the thermal performance of the walls. It is available in a wide colour range and it contains special preservatives that deter organic growths such as mould and algae. It also tends to shed dirt through the normal actions of weathering, so it stays brighter and cleaner for longer, thereby helping to reduce longer-term cleaning and maintenance costs.
When combined with Permarock SiliconeUltra K finish, Permarock Mineral Fibre EWI systems achieve an A2-s1,d0 reaction to fire classification and can be used on buildings of any height.
Performance and Sustainability
Permarock Mineral Fibre insulation is manufactured to EN 13162 and is CFC and HCFC free. It has zero Ozone Depletion Potential and zero Global Warming Potential.
Permarock Mineral Fibre External Wall Insulation systems exhibit thermal conductivity of 0.036 W/mK, and have an Ecopoints score of 0.10 (m2). This is classified as an ‘excellent’ rating. They have low embodied energy and are BIM Level 2 compliant. Clients can therefore use them as part of designs that produce very low U-values, including properties built to Passivhaus and EnerPHit standards.
Planning and Project Delivery:
Permarock technical staff assisted the project team during the design stage and throughout the installation. This included providing remote and on-site support for the system installer, ALD Group. Permarock also supplied project visualisations, drawings and installation details, material and colour samples, BIM Object files and thermal calculations. During the installation, staff also carried out quality inspections and appropriate record-keeping.
Result:
Work on site began in 2021 and the installation of the external wall insulation system was completed in the same year. The spa itself opened to guests in June 2022. In all, the £4 million programme took 58 weeks.
In 2023, less than a year after opening, the centre was named the UK’s Best Boutique Spa of the Year at the World Spa & Wellness Awards and was subsequently declared the best in the country. It has since won numerous other awards. In 2025, for example, it took the title of the Best Spa in the East Midlands and East at the Good Spa Guide Awards.
Project
Healthcare / Commercial Buildings
Client
Breedon Priory Holdings
Specifier
YMD Boon Architects
Substrate
Steel Frame & Sheathing Boards
System
Permarock Dual Density Mineral Fibre External Wall Insulation
Finish
Permarock SiliconeUltra K Finish